COBIAX | National Stadium
2011

National Stadium

Space for 58,145 fans

Project countryPoland

Project locationWarsaw

Architect JSK Architektur

Structural engineerMatejko I Partnerzy

Executing companyArge Alpine / Hydobudowa

The Polish National Stadium was built for the European Cup, 2012. It was designed to be a multi-purpose stadium, and for music events, it can accommodate up to 72,900 people. A two-deck underground parking garage is integrated beneath the playing field, with almost 1,800 parking spaces; above the ground, the stadium consists of six storeys with a room capacity of around 1 million m3.

The geological conditions demanded that the building be constructed on 15,000 pillars and columns of vastly different kinds; The stadium itself is a reinforced concrete structure.

Warsaw: Landmark

Where the whole world plays.

The National Stadium fulfils the requirements of the highest UEFA category (4); it offers 4,600 premium seats, 69 VIP boxes with 800 seats, 100 seats for the disabled and 900 seats for members of the press.

Four restaurants offer food for the fans; a premium restaurant, at an elevation of 40 meters, with a usable area of 1,300 m2, provides a panorama view of the Weichsel River and the historic city centre of Warsaw. Fans can also get active – there is a gym, with a surface area of 2,500 m2, directly on site.

Matches can be played, whatever the weather: the grass can be heated, and if necessary, the roof structure can be closed completely. It is made of fibreglass-reinforced woven fabric, with a teflon coating, which makes it resistant to rain and sunshine. Even an 18 cm layer of wet snow is no match for the roof.

Intelligently facilitated

Cobiax in the service of outstanding architecture

The overall load of the building should be kept as low as possible, in order to keep distortion within limits, and in order to keep the support structure as light as possible. Therefore, for large sections of the slabs in the upper storeys, altogether about 152,000 m2 of the entire floor area, Cobiax voided flat plate slabs were used, together with precast elements. (The semi precast elements further speed up the building process, because, by connecting the voided modules with the precast elements, the concrete screed can be thrown in a single working day.)

By using the Cobiax technology, the concrete consumption was reduced by 13,700 m3; which means a reduction in the building’s own weight by 342,500 kN. Besides the aesthetic, logistic and ecological advantages, this saving in terms of concrete and support components and structures also led to a reduction in the overall project costs for the National Stadium, in the area of reinforced concrete construction.


Image 1: © Heinze Cobiax Deutschland | Image 2: © https://www.shutterstock.com/be/g/vadym+tarasov | Image 3: © https://www.shutterstock.com/g/AnnaSwiderska

Product line used

Cobiax SL

The modular product line for international use, thanks to the half-shell technology. This line of products enables effective transport and easy assembly.

Learn more.

More Projects

2023

ProSiebenSat.1 New Campus

Unterföhring

Sustainability at its best: LEED certification in gold

Learn more.
2023

QH Track – Quartier Heidestrasse

Berlin

100.000 m2 office space refined with Cobiax

Learn more.
2022

Lobster Headquarters

Tutzing

Cobiaxing in Tutzing: The IT company’s new head office

Learn more.
2021

Maritim Congress Hotel

Ingolstadt

220 hotel rooms of 4 stars plus category and 6000 m2 of conference area

Learn more.
2021

Dreiländergalerie

Weil am Rhein

Tons of shops, tens of restaurants, a multi-storey car park – and a void former system: Cobiax.

Learn more.
2021

Center of Excellence

Dubai

The excellent kind of health care center.

Learn more.
2020

United Nations Campus

Bonn

All points set to sustainability.

Learn more.
2020

FLUX

Dübendorf

New Eawag building for research and teaching

Learn more.
2020

Barmelweid Clinic

Erlinsbach

Barmelweid is expanding in order to be able to accept all patients in the future.

Learn more.
2020

Ulm University

Ulm

An additional new building that provides more energy than it consumes.

Learn more.
2020

Assima Tower

Kuwait City

Improved: Assima Project – The largest commercial building in Kuwait City

Learn more.
2020

Arburg Training Center

Loßburg

The new building is symbolic of the philosophy of sustainable building.

Learn more.

News

All the news from the world of construction

Leadership

At the beginning of every pioneering development, there are visionaries who turn theoretical possibilities into reliable technology. And strong people who are able to draw their will to succeed in the practical implementation of ideas, from the powers of possibility.

Jörg Tilmes

Managing Director

Volkmar Wanninger

Managing Director

Georg Miedzik

Managing Director
Wider Scopes as an obligation
Cobiax is more than just a brand. The catch phrase “Wider Scopes” extends far beyond the possibilities for modern slab technology. It is a commitment to providing more room for play for people, in the scopes and spaces in which they live and work.
Learn more

Newsletter

Never miss out on any news again. Click on the button below to register for our newsletter.

Cobiax Newsletter.

Become a part of something bigger?

Career and development at the innovation champion.

Vacancies