Project countrySwitzerland
Project locationBrunnen
Builder Hertipark AG
Architect BSS Architekten AG
Structural engineerAF Toscano AG
Executing companyBolfing AG
With the Hertipark on the former industrial site, a new, mixed quarter with a high quality of life is being created in Brunnen Nord – central, future-oriented and lively. In a first phase until May 2022, 88 apartments as well as a wide range of retail, service and office space will be realised.
An aerial photograph shows the dimensions of the construction project most clearly:
Here is one of the many Cobiax areas where the Cobiax SL modules are being used:
Images: © Porr Suisse AG
The modular product line for international use, thanks to the half-shell technology. This line of products enables effective transport and easy assembly.
Learn more.Sustainability at its best: LEED certification in gold
Learn more.The departments of engineering and design will move into the 2nd construction phase of the Mainz University of Applied Sciences, which is equipped with Cobiax technology and has a total floor space of around 13,000 m2.
Learn more.