Cobiax Big5
Your Yield
Technology
Idea & Concept
Design
Execution
Expertise
Product Range
Service Proposal
Projects
Downloads
Cobiax Group
Cobiax - Logo
© Cobiax Technologies AG
deutsch italiano francais español Contact Home
Lightweigth Solutions in Concrete...
 
Execution of cobiax Flat Slabs
The cobiax flat slab can be executed either as an in situ solution or by using semiprecast modules.
Videoclip Windows Media «Installation of cobiax cage modules», 09.07 12MB
In situ application
Single cage modules (CBCM) or linked cage modules (CBLM) can be incorporated for in situ applications. The modules are tied to the bottom steel and the concrete is poured in two stages in order to compensate for the buoyancy created by the cobiax void formers in the wet mix. After the bottom reinforcement is trapped by the first pour the deck is topped up as normal for casting of any flat slab.
 
The simplicity of the cage modules allows for in situ applications where void forming has not been possible in the past. The in situ system has been designed to be very economical.
 
Semi-precast application
In the semi-precast solution (CBSP), caged hollow spheres (CBCM) are combined with semiprecast concrete panels. The semi-precast elements are delivered to site «just in time» and erected as a void formed permanent shutter with a factory finished smooth soffit.
 
A B
Picture A: CBSP This happens either by incorporating the cages in the semiprecast concrete panels at the factory
Picture B: CBCM or by putting the cages on the semiprecast concrete panels on site. The semiprecast panels are delivered to the site «just in time».